Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Several separate baseline HVAC systems on one floor.

Hello colleagues, I have a question from our energy modelling team. The question is about baseline HVAC systems modelling. ASHRAE 90.1, appendix G, point G3.1.1 requires modelling systems 5-8 one per floor. In accordance with point G3.1.2.8 requirement design airflow rates shall be based on a supply-air-to-room-air temperature difference of 11°C (20°F). In a modeled building, there are groups of rooms with deferent heating and cooling setpoints on each floor. If we model one system for all rooms on one floor, we will not complete point G3.1.2.8 requirement (temperature difference) for some rooms. Do we need to divide the system into several separate systems on one floor in this case?

2

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 08/26/2015 - 20:34

When faced with a conflict in the modeling protocol it is up to you to suggest a solution. In general the more conservative (lower savings overall) the coutcome the more likely that the method would be acceptable. With that said I think you have three options. The first two are probably the most conservative, the last one would still likely be acceptable. 1. Model one system and use the lowest cooling set point for the entire system 2. Model separate systems of the same system type for the spaces with the different set points. 3. Determine a weighted average set point and use this for the entire system. In any case just provide a narrative justification to the reviewer.

Tue, 09/01/2015 - 06:45