Our project includes an existing (more than three years old) DES that serves both the process equipment and building htg/clg loads. The designer would like to recover heat from the process equipment and reuse to heat the building. To achieve EAc3 would we be required to commission the process equipment and DES and transmission/distribution system if we were only recovering waste heat? I believe the answer to be no since our proposed energy model does not account for energy efficiency savings from the DES.