Both uploads SSc6-3 and SSc6-4 require the provision of “a copy of the most recent stormwater inspection and a log showing that any needed maintenance or repairs were performed within 60 days of the inspection that uncovered them”. Are two different inspections necessary one during the performance and another one during the establishment period?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Karin Miller
Senior Sustainability ManagerYR&G
33 thumbs up
May 20, 2015 - 6:05 pm
The credit requires that an annual inspection program of all stormwater management facilities be implemented to confirm continued performance, that documentation exist for the inspection and that all routine required maintenance and necessary repairs or stabilization occur within 60 days of inspection. The key here being that it’s an annual inspection program.
For the documentation of this credit, it should be sufficient to perform an inspection during the performance period and upload the inspection report and a log showing that any needed maintenance or repairs were performed within 60 days to both sections. If the project is a recertification, annual inspection logs would be submitted.
Charalampos Giannikopoulos
Senior Sustainability ConsultantDCarbon
84 thumbs up
June 22, 2015 - 1:02 pm
Thank you Karin. That said do you think that we still need to provide two different inspection reports, one for Upload SSc6-3 (Establishment) and an additional one for Upload SSc6-4 (Performance) or would one inspection report during the performance period be enough?
Trista Brown
Project DirectorWSP USA
456 thumbs up
July 7, 2015 - 10:07 am
Only one report (from your most recent inspection) needs to be provided. The credit form is broken into Establishment and Performance sections for recertification projects, and it can be a little clunky at times.