Our project has 4 garage levels. There are 3-4 elevator lobbies on each level. The lobbies are small and receive OA from RTUs serving the offices above. In the past, we have generally sampled these locations.

Our client is concerned about the additional cost to test these locations. Wondering if anyone out there has ever worked on a project where the elevator lobbies have been omitted from the testing strategy?