FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Precision Air Conditioning for Server Room and Art Gallery

Dear All We have two projects that are attempting LEED 2009 NC Certification the first one is office building with server room and the second one is Arg Gallery. Both projects use precision air conditioning for server room and art exhibition room respectively. Could anyone please clarify 1) Is there any efficiency requirement as per 6.4 mandatory provision of ASRHAE 90.1-2007 for precision air conditioning 2) Can we assume the energy consumption by precision air conditioning used for server room and art exhibition are process energy. Therefore, the energy consumption for baseline and design case will be the same. Thank you much Panupant

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 03/04/2015 - 14:58

1. I am not familiar with the term "precision" air conditioning. If none of the systems in the 6.8.1 tables applies to the system in question then there is no minimum efficiency requirement. If you check newer version of 90.1 you may find the system addressed to get an idea of the minimum efficiency to seek. 2. Neither are considered process energy. They are conditioning space for the equipment/art and the people in those spaces. You can't separate the two in many situations.

Wed, 03/04/2015 - 16:01

Dear Marcus Thank you very much insightful clarification. The precision air conditioning uses cooling and reheating for precisely controlling temperature and relative humidity. The example of the product can be found in the following link: http://www.airedale.com/web/Products/Precision-Air-Conditioning.htm. For us, it is not clear whether the term "Air Conditioners" in table 6.8.1 covers the precision air conditioning so that its efficiency has to meet the minimum efficiency requirement. Can you please advice ? Thank you Panupant

Wed, 03/04/2015 - 16:15

This looks like the systems addressed in Table 6.8.1K in ASHRAE 90.1-2010. So I agree that they are not covered in 2007 and have no minimum efficiency requirements for LEED 2009 projects.

Wed, 03/04/2015 - 16:25

We had a related issue on a project where the vendor said that they did not need to comply with the minimum requirements of 90.1 for a Data room because the system fell under 90.1 exception 2.3c - use energy primarily to provide for commercial processes. However as the cooling is not classed as process energy under leed 2009 we could not beat the baseline building without the cooling unit meeting/beating the 90.1 minimum values used by the baseline (system 3).

Fri, 03/06/2015 - 02:34

Dear Marcus and Victoria Thank you very much for your advice and sharing.