After a design or construction submittal review, if one (or more) of the ID credits is not accepted, may it be replaced with a different ID attempt on the re-submittal? Myles Huddart LEED AP BD+C

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 02/20/2015 - 21:34

Swap away. I always like to have a couple of extra ID ideas in case something gets rejected. It can be easier to document a new credit instead of massaging a submitted credit that got shut down. Swapping out between design and construction reviews is not a problem. If you have a final construction review and still need that ID point, you'll have to appeal to get them to consider the new ID credit. I'm sure someone outlines that in this forum.