FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Does energy model should include walls to be consistent w/ Plf2

I am working on a project (2 story office building) as a LEED AP & architect and received Preliminary Design Package comments from GBCI. One of the comment was about the building's gross square footage (6219 in Plf2) does not match to energy model square footage. Mechanical engineer revised his calculations for the final design package submission and brought up his sqf from 5005 to 5812 sqf however his model still does not include the walls. Mechanical engineer told me that he can not include the walls and left his sqf at 5812. It makes sense that he did not include the walls but I am not sure how GBCI will interpret this. I know that all square feet information throughout a project should be consistent but in this case, GBCI should have some sort of exception. Please share your experience and suggestions. Thanks

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 12/22/2014 - 18:38

Consistent and identical are two different things. Some energy modeling software (but not all) uses the net square footage instead of the gross square footage. For PIf2 you are supposed to enter the gross square footage. For an energy model using net square footage you can enter the net square footage in EAp2. In general the net sf should be within 10% of the gross sf. Looks like the reason that the original areas were questioned. Looks like you should be OK with the revision.

Mon, 12/22/2014 - 23:32

Thanks Marcus

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.