We have a small project that consists af an existing one level building that will have an major renovation. No exposed soil is present nor there is a garden or landscape therefor during the major renovation no exposed soil will be present.
We would like to have an advice on how to comply with a ESC plan where no exposed soil will be present. Dust generation will be present an mitigated, however typical issues of a project where a big amount of soil will be disturbed is not our case.
Ward Miller
Chief Environmental OfficerAlpenglow Advisory
64 thumbs up
February 12, 2018 - 5:49 am
Doesn't matter, as a LEED prerequisite all projects under this rating system must use the ESC Plan measures that apply to the project. For example, if you won't use concrete you obviously won't need a washout basin, but you will still need to ensure you have filters around drains.