A building earned enhanced refrigerant management for LEED NC but had to add one unit during the performance period due to theft. I'm sure the existing units have probably had refrigerant added since they were installed, but none during the performance period (3 months). The new unit has not had refrigerant added since installation.

Could I simply update the LEED NC form with the new equipment and submit that? (That form defaults to 2% LR). Or do I need to use the EBOM EAc5 form and add in all of the building equipment and use the 0.5% LR since no refrigerant was added during the performance period?