Hi everyone! I've some doubts about this points.

Whats is the setback temperatures?

The time setpoint not met is calculated only in the occupied hours? I ask this because the air conditioning in my building works at the same time that the time of occupation.

How can I prove these hours when there is no air conditioning in unoccupied schedules?

My energy simulation software presents a summary of the LEED only with "setpoint team not met" in time of occupation however, I received a question about the hours of non-occupation.

Setpoint does not work in that time has no occupation.

Thanks!