Hi, I am working on a data center project under NC 2009. For the proposed case we have self-contained steam electric humidifiers that are an accessory for the CRAH units; the question is if those humidifiers should be modeled the same in the baseline case, since there is no indication in ASHRAE 90.1 regarding the procedure for modeling humidifiers in the baseline model. The curious issue is that if I model them in the baseline case, they are causing a huge energy consumption in the baseline model because we are modeling economizers (zone 3C) and the zone is very dry (in the proposed model there are no economizers). Id appreciate your guidance.