The default materials calculation is 45% of construction costs (Div 3-10 primarily). Is there a generally accepted percentage of project costs that is considered to be construction costs? I recently saw a presentation that assumed 60% of project costs were construction costs. Is this generally accepted as a percentage, or is there a range? I know that it is project specific, but assume early estimation.