NC-2009 MRp1:Storage and Collection of Recyclables

Storage area for Group Certification

Hi, I'm now working on a Group Project certification under LEED 2009 NC. The Group is made of 3 separate buildings with a common basement dedicated to parking use. We're planning to locate the recyclables storage area in the basement, one space that serves the 3 buildings. Recyclables shall be delivered from each building by means an electrical vehicle (the moving operations will take place exclusively in the basement) Vehicles of Public Authority, in charge to pick up recyclables and not recyclables, (separated) may access to the basement (through a dedicated and protected lane). From your point of view, assuming an adequate sizing of the collection area, might this solution be compliant with the requirement? Thanks.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 07/25/2014 - 04:12

See my answer below to Christina.In terms of this specific situation, I would ask how recyclables are being collected prior to being moved to the central storage location? I would consider emphasizing that in your documentation.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.