EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis

Upgrades

Hi, If I did a narrative description about the HVAC at the begining of LEED project (PIf4), but know we have done some updates because of the level 1 audit, so do I need to change the HVAC narrative description, or I just need document those changes in order to show how Powerseal have been imrpoving and saving energy? thanks.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 03/26/2014 - 16:36

When PIf4 asks the project team to describe the building HVAC, lighting and electrical systems, we provide the following note "please see the Systems Narrative uploaded within EAp1". This eliminates the possibility for an inconsistency between the two.