Each of the 400+ residential suites is designed with an independent stand-alone ventilation system. According to the air testing requirement in pp. 497 of the LEED Canada guide 2009 below, does it mean there are 400+ separate zones to be tested? Per LEED guide 2009 NC, pp. 497, " For each portion of the building served by a separate ventilaion system, thenumber of sampling points must not be less than 1 per 2300 m2, or for each contiguous floor area, whichever is larger."
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.