Are there any significant changes in the baselines for WEc3 between NC 2.2/2008 and EBOM 2009?

The project is in a desert location with a large xeriscape mono-surface area, it's being built to NC and will then be certified under EBOM. It's assumed that the credit from NC will flow cleanly into EBOM, would any additional calcualtions/considerations will be required?