FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

process load categorization

Greetings. This is more of a LEED for Retail question pertaining to modeling a commercial kitchen. More specifically it is about entering process load results into the LEED EAp2 template's Section 1.6 Table EAp2-4, along the lines of refrigeration, cooking, commercial kitchen equipment etc. The catch-22 we're facing while using eQuest is: If process load input is broken down as direct load on different meters, it captures consumption separately but does not contribute to space heating and cooling loads. If process load is input into respective HVAC zones, the results are all lumped into one 'miscellaneous equipment' category. We do have detailed schedules and kW values for each piece of equipment but the difficulty is with outputting these categories separately while maintaining the accuracy of the model. Please advise. Thank you.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 09/26/2013 - 15:59

Rather than entering the load as a direct load on separate meters, the loads should be entered into the applicable spaces and then assigned to a different meter. The loads are assigned within the internal loads and the meters are assigned within the air-side HVAC zones. This will separate the energy use and still contribute to the heating and cooling loads. Quite often we will create a separate meter for the kitchen electric uses and another for the kitchen gas uses.