Just compared the OA rates measured at each AHU by the TAB contractor with our ASHRAE calculations. For some of the AHU's the actual OA (as measured by the TAB guy) far exceeds the min OA required of the AHU per ASHRAE. Technically this credits requires that you have no less than the minimum, but has anyone had an issue with the reviewer complaining about over ventilation of the spaces?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.