CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls

Lighting Load synergy EAp2 and EAc1.2

Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2? What if we took Occupancy sensor credit under EAp2 would that affect the input on EAc1.2?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 08/29/2013 - 14:36

EAp2 and EAc1.1 deal with actual connected lighting loads. The LPD cannot be reduced by using occupancy sensors or daylight dimming. The lighting controls are documented under this EAc1.2 credit.