This is my first time doing the LEED paperwork. I'm not sure I'm using all the correct fixtures while filling out prereq 1. Currenly I only have water closets and lavs filled out. There are no urinals on the project. Should I include kitchen sinks (break rooms) and showers (staff & Patient)? I ask because they are available in the pull down menu of the form, but the leed reference document I found only states "Calculations are based on estimated occupant usage and must include ONLY the following fixtures and fittings: water closets, urinals, lavatory faucets and prerinse spray valves. After reading that statement I only used water closets and lavs. I input all of the information, including my calculation for the dual flush toilets. I could not use the standard calculation since it is based on water closets and urinals. After inputing the numbers for staff, visitor, and patient usage and uploading the required documents, I meet the 20% reduction required for the prequisite. However, what through the red flag was my numbers did not meet the 30% reduction required for 1 LEED point. Because of this the Architect is questioning why I do not have other fixtures in the list. My installed flush rate for the dual flush toilets came out to be 1.27 gpf and my lav installed GPC is .1.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.