....does the project meet ASHRAE 90.1's Mandatory Provisions and therefore this Prerequisite? Our project has complicated set of facades with different curtain-wall patterns and types of glass. Two of those facade directions comply with the ASHRAE "Mandatory Provisions" requirements for SHGC, while the other two do not: the requirement is a SHGC for each facade of 0.25 and two facades are 0.203 and 0.245...the others are 0.266 and 0.264. Will this project be rejected for this prerequisite based on these figures?