My project is going for Option 1 of the MRc5 credit. Should I download a separate calculator to log the furniture information...that is should it be on a separate calculator than the MRc3 info? Or should all the info be longed on one calculator and upload twice, once under each credit?
Architect, LEED AP BC+D
HOLT Architects
LEEDuser Basic Member
24 thumbs up