Forum discussion

Healthcare-v2009 MPR3:Must use a reasonable site boundary

existing parking garage in the LEED project boundary

I am working on a project that is a part of campus. This project will be located next to a 4-story existing parking garage shared by other adjacent non-LEED certified buildings. The question I have is whether this parking garage needs to be included to the LEED project boundary. If so, does the garage need to comply LEED prerequisites and credits as well? If the existing parking garage should be included to the project boundary, this will include existing hardscape and landscape features around the garage as well. Does this mean the irrigation water calculation needs to include the existing irrigation area around the garage?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 04/30/2013 - 23:02

YP, is the parking garage part of the LEED project scope? If not, and it's simply adjacent to the LEED project, then it probably doesn't have to be included in the LEED boundary. If it is being built at the same time under basically the same project scope, and services the occupied building, then I probably would include it, and it would be factored into all relevant credits.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.