NC-2009 PIf2:Project Summary Details

Non-contiguous LEED boundary

I am working on a school renovation / addition project. The LEED boundary is currently indicated as being around the new / renovated buildings only as we are not doing work on other existing buildings, sports fields, or open spaces on site / campus. There is a new bio-retention pond going in on a remote portion of the site to accommodate storm water runoff which is not adjacent to the LEED building and I have indicted it as a seperate portion of the LEED project with a LEED boundary around it. One of the preliminary deisgn review comments indicated the LEED boundary is not compliant as it needs to be continuous and therefore violates the MPR 3 for a reasonable site boundary; however, the land between the new retention pond and the LEED project has no new work occurring on it. Should I try to persuade the reviewer to reconsider (is there anything I can site as precedent) or should I connect the boundaries of the LEED building and the new retention pond with areas that are not being worked on? Any help / guidance would be appreciated.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 01/24/2013 - 22:29

Todd, take a look at the MPR Supplemental Guidance document and the Application Guide for Campus and Multiple Buildings projects document, they address shared amenities such as stormwater infrastructure.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.