Is this where I should comment on LEEDv4 EBOM changes? Also, I'm not sure where the best place is to post this comment, but there is an error in the new EBOM checklist. In the EBOM hospitality tab, the MR total does not include MRc5, so it shows only 6 possible MR points, and a total of only 108 points in the rating system. Fortunately, the spreadsheet is not locked, so it is an easy fix.
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up