Our campus has multiple buildings, one of which is going for EBOM now. The PV array is adjacent (in the parking lot). The PV's do have a meter, so we know their output. This output along with the local utility are like a pool, powering the entire campus. If we share the PV feature for LEED certification among all the buildings (using a sf allocation perhaps) the renewable energy to each building will be so low that no one will really get this EAc4, despite the millions of $ spent. What are our options?