We are designing a dry water feature on a campus app guide project. The pumps will be on a limited schedule. How will the pumps be factored into the energy credit? thanks for your help
If they are included within the project boundary they need to be included in the models. The pump energy would be considered process and therefore identical in both models.
What is a dry water feature? Just curious.