EBOM-2009 SSc7.1:Heat Island Reduction—Nonroof

Existing Building for LEED on Campus - EBOM Path

I am working on a building for LEED Certification - it is one of several buildings on campus (the others are not going for LEED status at this time). The site's parking areas are more than 50% exposed (less than 50% underground, covered, etc.) The walkways around the building are concrete and other walks on campus are asphalt. There is a parking structure adjacent to the building that is concrete and the rmeaining on-site parking is asphalt - but the parking serves multiple buildings - so, how does one determine this point/credit for an EBOM path while concentrating on only this building on the entire campus? What is the limit/extent of distance that we can go to that would allow us to count the walkways around and adjacent to the building as concrete?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 04/10/2012 - 11:16

David, the first thing I would review to get answers on this is the LEED Minimum Program Requirements supplemental guidance document from USGBC. Look for ths section on setting a reasonable project boundary, and in particular the guidance on parking serving multiple buildings.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.