We have building renovation that is refurbishing 80% of a building aiming for CS 2009. There will be some existing ventilation and cooling systems that (a) have primary plant that is being retained and changes to the secondary in-room equipment (b) are being retained exactly as they are today. Must we commission these existing systems?