Forum discussion

CI-2009 EAc3:Measurement and Verification

Are Form submetering requirements greater than Ref Guide?

In Case 1 (project

3

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 10/18/2011 - 15:44

Based on Table 2 in the Reference Guide I think the answers to your questions are: - A submeter is required for process water - If an all-electric AHU is serving only your space then a submeter is required. If the AHU serves your tenant space and another space, then a submeter is not required (if you are already paying a pro-rated portion of the bill as part of rent) - It seems as if a submeter would be required if the electric reheat is only present in your space

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.