Forum discussion

Modeling targets and after M&V

2

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Sat, 10/16/2010 - 14:04

For EAc1 you submit the modeling results for evaluation and this determines the number of points. The model submitted for this credit must be consistent with the modeling information included in your M&V Plan for EAc5. If the model is showing a 44% savings then that is what should be submitted. Not sure why anyone would want to submit for less savings that the modeling results indicate. This would cost you several points and require you to make up stuff in the models to get down to the 30% (assuming everything is correct in the models showing a 44% savings). Typically credits are given two reviews, preliminary and final. If you wish to add any points after the reviews are complete you would need to appeal the credit(s).

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.