Currently, I am able to score 2 to 3 points under innovation through Exemplary performance at possible places. Apart from that Under Path 1, I am aiming to claim a point for innovation in design by the use of Big Ass Fans in our design and corresponding computation of energy savings per annum to support my design. So out of maximum possible points of total 5, i would score 3 to 4 points via path 1 and 2. Can I still aim to score the rest of the points through Path 3, which is through one/ two of the pilot credit? Also, to the bottom of this page http://www.usgbc.org/DisplayPage.aspx?CMSPageID=2104 , i find that its specified as "Pilot Credits Closed for Project Use. The following credits have received sufficient project feedback and are no longer available for testing" .so, I would like to know, if still the pilot credits are open for claiming the points, if taken an effort to execute in the project. Thanks.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11477 thumbs up
August 5, 2010 - 9:16 am
There is a section of that page that is reserved for closed pilot credits, but it says "There are currently no pilot credits closed for project use." All of the pilot credits listed there and here on our site are available, and you can earn up to one point for your project pursuing one.I am doubtful that you could earn a point through IDc1 for using a Big Ass Fan, though. Check out our guidance on the IDc1 page for more about this, but it doesn't seem like a comprehensive solution, and energy savings are already addressed through EAc1.