Forum discussion

EBOM IEQp1

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 04/26/2010 - 14:05

I only determined it for the Potentially Critical Zones. If you look at the 6MZ Calc spreadsheet under the Directions tab, line 23, it names Inputs for Potentially Critical Zones and provides guidance for determining these zones. They're generally zones with high occupancy load and low heating or cooling loads so they don't get as much air flow from the air handlers. I've seen it worked for the whole building on other projects, but when I worked this prereq, I only did it for the interior conference room and earned the prereq.

Mon, 05/17/2010 - 04:12

Hi Kim - You will need to include all building spaces in this prerequisite. Up to 10% of the building can be excluded if it is under separate management control; this is the case for all prerequisites and credits except for EAp2.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.