My project has a small vestibule inside the front door. Can the 10 feet of walk-off mats be in 2 sections that are perpendicular? As in, you hit one mat in the vestibule, turn 90 degrees and hit the other mat (totaling 10 feet)...
THANKS.
Forum discussion
EBOM-2009 IEQc3.5: Green Cleaning—Indoor Chemical and Pollutant Source Control
My project has a small vestibule inside the front door. Can the 10 feet of walk-off mats be in 2 sections that are perpendicular? As in, you hit one mat in the vestibule, turn 90 degrees and hit the other mat (totaling 10 feet)...
THANKS.
LEEDuser is supported by our premium members, not by advertisers.
Go premium forTo post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
April 16, 2010 - 5:53 pm
The IEQc3.5 credit language specifies "in the primary direction of travel," so this should work fine as long as the perpendicular route is in the line of travel, i.e. that someone entering the building basically has no choice but to walk the full 10 feet. If they could cut a corner and walk only 5 or 8 feet of it, I might have concerns.
Jared Silliker
OwnerSilliker + Partners
77 thumbs up
April 27, 2010 - 10:36 am
Thanks, Tristan. One other nuance ... are there any mat requirements, in terms of backing, pile, material, etc. ??
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
April 28, 2010 - 9:33 pm
No, I don't know of any specific requirements. The key thing would be whether the mat was made for that purpose and is effective in the building.
Cailey D.
Cactus Mat Mfg.17 thumbs up
October 13, 2010 - 7:51 pm
Hi Tristan, Along the lines of the mat requirements Jared mentioned, I cannot find anywhere under the EBOM system the requirement for the carpet system to be certified by the Carpet & Rug Institute - is that low emitting flooring/carpets credit not applicable for Exiting Buildings? Would installing new matting that is certified and/or increased to ten feet qualify for EBOM 2009 IEQ1.5 as an alteration (adding the extra feet) or as an addition (getting new carpet that is certified by the CRI or equivalent). I know there needs to be an additional trade change besides just the matting...thanks!
Jason Franken
Sustainability ProfessionalLEEDuser Expert
608 thumbs up
October 14, 2010 - 9:40 am
Use of carpeting that meets CRI Green Label standards is actually rewarded elsewhere in EBOM, specifically under MRc3 - Sustainable Purchasing, Facility Alterations and Additions. Replacement of carpeting in a project building alone would not meet the LEED definition of "facility alteration or addition"; a renovation project must employ more than one trade, so for example, painting and new carpeting could qualify a project for MRc3 (and MRc9).
Any project can attempt EQc1.5, because all that credit requires is that you develop an Construction IAQ Management Plan for future renovation projects. If you also attempt MRc3, you'll need to explicitly document that your Plan was executed throughout the performance period to meet the compliance criteria.
As far as EQc3.5 goes, the key requirement for entryway systems is that the material used is classified as a walk-off mat surface. There are some carpet materials available that may meet this criteria; however, whether or not the carpet is CRI Green Label certified would have no bearing on compliance with EQc3.5.
Emily Catacchio
Sustainability SpecialistWight and Company
610 thumbs up
June 13, 2012 - 9:24 am
Jarod, Was your perpendicular strategy approved?Thanks!