You must use an Alternative Compliance Path to document savings from a non-potable source in LEED Online. Adjust the design case total water use volume to account for the annual amount of non‐potable water. Then use the adjusted design case total water use to recalculate the percent reduction of water use for all fixtures. Additional documentation or calculations may include but are not limited to plumbing drawings, calculations and system capacity to support quantities provided, and any analysis to confirm the availability of the non‐potable water source.