 Many teams consider Option 1, but ultimately choose Option 2 for one of two practical reasons:Scheduling the flush-out is not possible.The building’s HVAC will not be able to maintain the required temperature and humidity levels for the duration of

Many teams consider Option 1, but ultimately choose Option 2 for one of two practical reasons:

  • Scheduling the flush-out is not possible.
  • The building’s HVAC will not be able to maintain the required temperature and humidity levels for the duration of the flush-out. Doing so will also be energy-intensive.