Log in

To achieve the first five points in Option 1 the design engineer has to demonstrate that the HVAC system in the space can maintain minimum temperature and humidity ranges that meet ASHRAE-55. This requirement makes those points tricky for projects that do

To achieve the first five points in Option 1 the design engineer has to demonstrate that the HVAC system in the space can maintain minimum temperature and humidity ranges that meet ASHRAE-55. This requirement makes those points tricky for projects that do not have humidity control, especially in regions with high humidity.

Credits: 
Project phase: 
Credit tip type: