This is a particularly difficult path to comply with because tenants don’t have control over the entire building, or over other tenants’ design and lighting layouts. This compliance path implies requesting lighting power density from all other tenants and measuring light leakage from the windows. It can be time-consuming to document.
Credits:
Project phase:
Credit tip type: