A helpful waste management plan should indicate the following:

the types of waste building materials anticipated from the job
how much waste building material is anticipated from the job
possible ways to divert each material, such as sending it to an identified recycling plant, salvage yard, or donation entity—or to reuse the material onsite for new construction
the method for ongoing tracking and quality control 
methods for separating and measuring waste either on- or off-site.

Credits
Credit tip type