Log in

Fill out the LEED Online credit form. The total calculated flush-fixture water-use for the baseline and design cases will be automatically generated once the WEp1 credit form is filled out. You will need to provide information on annual reused water amoun

Fill out the LEED Online credit form. The total calculated flush-fixture water-use for the baseline and design cases will be automatically generated once the WEp1 credit form is filled out. You will need to provide information on annual reused water amount and, and if necessary, plumbing drawings or calculations illustrating that your non-potable water systems are capable of supporting the quantities determined. 

Project phase: 
Credit tip type: