All five SMACNA control measures have to be documented in a photo log. It is easy to take pictures of covered ducts, but don’t forget to also take photos of more process-oriented strategies such as housekeeping and pathway interruption. The pictures should clearly show all the control measures adopted during construction. Photos should be submitted with a brief description, the time and date, and an indication of what SMACNA practice is demonstrated.