Depending on the compliance path selected:
Run preliminary calculations calculated by the acoustics consultant or mechanical engineer, as defined by the 2007 HVAC Applications ASHRAE Handbook, Chapter 47, Sounds and Vibration Control and determine any design changes needed for compliance.
Follow the design recommendation in ANSI S12.60-2002 and determine any design changes needed for compliance.
Credits
Project phase
Credit tip type