Log in

Establish goals for water use reduction and include these goals in the Owner’s Project Requirements (OPR) for EAp1: Fundamental Commissioning. Consider aiming higher than a 20% reduction. Many of the same strategies used for this prerequisite will a

Establish goals for water use reduction and include these goals in the Owner’s Project Requirements (OPR) for EAp1: Fundamental Commissioning. Consider aiming higher than a 20% reduction. Many of the same strategies used for this prerequisite will also apply to WEc2: Innovative Wastewater Technologies and WEc3: Water Use Reduction.

Project phase: 
Credit tip type: