A copy of the plumbing fixture schedule from the project's construction documents, outlining detailed information for each flush and flow fixture specified (including fixture manufacturer, model number and flow rate) helps the review team verify that those fixtures are part of the construction contract. In the absence of such documentation, a copy of project-specific specifications and details or a project-specific contractor’s submittal with manufacturer’s cut sheets highlighting flush and flow rates for each fixture specified can be provided.
Question
Will the reviewers accept a spreadsheet as a plumbing fixture schedule in lieu of the plans from the Construction Documents?