Waste from demolition and remodeling accounts for a significant portion of what goes into landfill. Designing for future use and modifications can reduce the intrusiveness of renovations, significantly reducing the future waste.

Additional Questions

  • Why were the specific measures that were installed chosen?
  • Were additional measures not included in this credit, with the intent of improving uni-versal design or minimizing the waste from future modifications installed? If so, what were they? 

Credit Submittals

General

  1. Register for Pilot Credit(s) LEEDuser.com, and participate in online forum
  2. Submit the feedback survey using the link on the USGBC.org credit page; supply PDF of your survey/confirmation of completion with credit documentation

Credit Specific

  • List exactly which measures were installed
  • Sign off by the green rater sign off that the measures were installed in each unit.
Credits