Waste from demolition and remodeling accounts for a significant portion of what goes into landfill. Designing for future use and modifications can reduce the intrusiveness of renovations, significantly reducing the future waste.
Additional Questions
- Why were the specific measures that were installed chosen?
- Were additional measures not included in this credit, with the intent of improving uni-versal design or minimizing the waste from future modifications installed? If so, what were they?
Credit Submittals
General
- Register for Pilot Credit(s) LEEDuser.com, and participate in online forum
- Submit the feedback survey using the link on the USGBC.org credit page; supply PDF of your survey/confirmation of completion with credit documentation
Credit Specific
- List exactly which measures were installed
- Sign off by the green rater sign off that the measures were installed in each unit.