Very confused - Natural Ventilation

NC-2009 IEQc2:Increased Ventilation
posted by  Jeff Potter  on 

My building currently achieves IEQp1 for Mechanical Ventilation rates.

4
Default Avatar
Mechanical Engineer
CJL Engineering
LEEDuser Basic Member
22 thumbs up
Tue May 6, 2014, 2:09 pm
10
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Mon May 5, 2014, 11:01 pm

IAQ Testing - Maximum Concentrations

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Donald Green  on 

Can anyone tell me where the Maximum Concentrations listed in the reference guide came from? Who established them, is there a document or website that can be visited? Thank you,

4
Mon May 5, 2014, 7:49 pm

Central Plant - LEED Group Project - 2 Buildings

NC-2009 EAc1:Optimize Energy Performance
posted by  Victoria Watson  on 

Hi, I have a central plant in 1 building that serves an adjacent building.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon May 5, 2014, 5:12 pm

LEED For Schools 2007 discrepancy

Schools-2009 SSc10:Joint Use of Facilities
posted by  Esmeralda Ward  on 

This question concerns the LEED for Schools 2007 Rating system. In the reference guide, the Option 1 compliance path does not include Joint parking areas as one of the spaces that could contribute

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon May 5, 2014, 4:56 pm

Furniture documentation

NC-2009 MRc4:Recycled Content
posted by  Nouran Abdel-Rahman  on 

Can I add the total cost of furniture, and consider it as one item in the LEED form?

4
Mon May 5, 2014, 4:10 pm

No water use

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Henrique Mendes  on 

What happens if we are working on a project that has no water use. No fixture or fittings... How to comply with the prerequisite? Or does that mean that this project is not elegible for LEED?

3
Director
LEAD Consultancy Engineering Services
LEEDuser Premium Member
0 thumbs up
Mon May 5, 2014, 3:54 pm

NC Boundary - campus control

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Phillip Cook  on 

I am working on a building on a hospital campus.

2
Mon May 5, 2014, 3:17 am

Final Design Review - Language issue

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Gaston Michaud  on 

We just received the response of the final design review and the Enhanced Commissioning Credit was denied since the contract that describes the scope of work and the completion date is in Spanish.

9
Sun May 4, 2014, 4:13 am

Modeling buildings w/ no proposed cooling; Workaround?

NC-2009 EAc1:Optimize Energy Performance
posted by  Jason Chenard, PE  on 

On Sept 12, 2012 there was a thread: "Proposed model, CAV system without cooling system". It references a "high temperature set point work around".