PC 112 Calculating costs
posted by Maki San Miguel Paulson on
The requirement is to use 25% by cost, of the total value of permanently installed products in the project.
Converting Inches to volume of rainfall
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Mihir Parikh on
Does anyone have an accurate way of converting total inches of rainfall to cubic feet as required by the credit?
phases of project & VOCs
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Debra a. Lombard on
we are a GC working on a project that is the renovation of a historic bldg and that renovation started a very long time ago '(about 3 yrs ago) and about a year before the project was registered for
LOCAL EQUAVALENT - WHERE EIA IS NOT COMMONLY DONE (INDIA)
Healthcare-v2009 SSp2:Environmental site assessmentposted by jesmin joseph on
Dear Sir, We have registered a 200 bed Multispecialty hospital in India under LEED V2009 BD+C Healthcare rating system.
raw material invoice submital
Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Esther Kohout on
I am trying to locate the info that shows the total cost of material is to be used in LEED calulations, not including the installation labor.
2 Types of Tviz in each window
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ileana Schinder on
The windows in my project have 2 types of t-viz in each window (above 8'0 is non visible light). How do you document 2 types of tviz in a single room? the excel file doesn't accomodate for that.
Gym is throwing off IEQ credits!
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ileana Schinder on
We are working on a Recreation Center (Total SF 19,200), the gym is 7,200 and the rest of the building is made up of classrooms and other shared spaces.
Daylighting Simulations
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Joel Jude Tadeo on
For a project that has multiple typical floors and a large area, is it allowable to simulate a typical floor and just multiply the non/daylit areas for documentation?
Help with LEED ND
ND-v4 MPR1:Must be in a permanent location on existing landposted by T J on
Im a beginner and not familiar with the certification process and actual documentation. Where can I get samples or ideas on how to to begin making a simple LEED-ND assessment report including check
Exterior windows and doors?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Erin Holdenried on
I assume exterior window and doors are included in this credit, as they are excluded from MRc1.1?