Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EPR Example

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Jenelle Shapiro  on 

Does anyone have an example of compliant EPR documentation?

0

EBOM V4 School

Schools-EBOM-v4 SSp1:Site management policy
posted by  George Dreger  on 

In creating a Site Management Policy what are the options for maintenance equipment. Is maintenance equipment a prerequisite or credit?

1
Tue Jan 17, 2017, 9:18 pm

Lead Lined Doors

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Tim Murray  on 

We have a lead-lined door for a dentist x-ray room. The manufacturer cannot confirm that the particle board core is formaldehyde free.

1
Wed Dec 21, 2016, 6:09 pm

water cooled chilller

NC-2009 EAp2:Minimum Energy Performance
posted by  sherif el adly  on 

Hi Marcus The building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice sto

1
Thu Dec 1, 2016, 5:40 pm

green power source

NC-2009 EAc6:Green power
posted by  sherif el adly  on 

The client have a solar park in a land adjacent to the land on which the project will be built.

1
Thu Dec 1, 2016, 7:10 pm

Substantial Completion, C of O, TCO

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Erika Duran  on 

Per the LEED certification Policy – we can submit construction review at Substantial Completion (defined as the date on which the building receives a Certificate of Occupancy or similar official in

1
Tue Dec 6, 2016, 9:38 pm

Use of Hycrete waterproofing admixture for Innovation credit

NC-2009 IDc1:Innovation in Design
posted by  Donna Juselis  on 

Our project is a mixed use redevelopment in a flood prone area. The first floor slab-on-grade on the project is located below the design flood elevation.

1
Fri Dec 16, 2016, 7:14 pm

Process temperature controlled space

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Karen Elliott  on 

Hi I have a project where the temperature must be controlled automatically to ensure the manufactured product quality is maintained.

1
Sat Jan 7, 2017, 11:08 pm

Non Local Supplier

CS-2009 MRc6:Certified Wood
posted by  Jose Antonio Kovacevic  on 

Hi, We have a non local supplier.

1
Mon Aug 28, 2017, 2:53 pm

Modeling system serving both HVAC and Process

NC-v4 EAc2:Optimize energy performance
posted by  Visu Boj  on 

We are doing certification for a beverage factory. The factory requires chilled water for process load that is served by 2*1080 kW Evaporatively cooled Screw chillers.

1
Sun Dec 4, 2016, 8:36 pm