EPR Example
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jenelle Shapiro on
Does anyone have an example of compliant EPR documentation?
EBOM V4 School
Schools-EBOM-v4 SSp1:Site management policyposted by George Dreger on
In creating a Site Management Policy what are the options for maintenance equipment. Is maintenance equipment a prerequisite or credit?
Lead Lined Doors
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Tim Murray on
We have a lead-lined door for a dentist x-ray room. The manufacturer cannot confirm that the particle board core is formaldehyde free.
water cooled chilller
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
Hi Marcus The building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice sto
green power source
NC-2009 EAc6:Green powerposted by sherif el adly on
The client have a solar park in a land adjacent to the land on which the project will be built.
Substantial Completion, C of O, TCO
posted by Erika Duran on
Per the LEED certification Policy – we can submit construction review at Substantial Completion (defined as the date on which the building receives a Certificate of Occupancy or similar official in
Use of Hycrete waterproofing admixture for Innovation credit
NC-2009 IDc1:Innovation in Designposted by Donna Juselis on
Our project is a mixed use redevelopment in a flood prone area. The first floor slab-on-grade on the project is located below the design flood elevation.
Process temperature controlled space
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Karen Elliott on
Hi I have a project where the temperature must be controlled automatically to ensure the manufactured product quality is maintained.
Non Local Supplier
CS-2009 MRc6:Certified Woodposted by Jose Antonio Kovacevic on
Hi, We have a non local supplier.
Modeling system serving both HVAC and Process
NC-v4 EAc2:Optimize energy performanceposted by Visu Boj on
We are doing certification for a beverage factory. The factory requires chilled water for process load that is served by 2*1080 kW Evaporatively cooled Screw chillers.