Can I omit the IP credit since it is stand alone?

NC-v4 IPc1:Integrative process
posted by  wachira sosaeng  on 

Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.

1
Mon Aug 1, 2016, 3:21 pm

Narrative explaining compliance of ESC plan with NPDES guideline

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Madhura Dhayagude  on 

Hi, We are currently in Construction review for a MFHR project based in Philadelphia, PA.

1
Sat Jul 30, 2016, 8:28 pm

Energy Star compliant attic access doors

LEED for Homes (LEED-H) Forum
posted by  Phil Vanderloo  on 

Can anyone steer me to a good source for a residential attic access door with compliant gaskets and insulation required by Energy Star V3? Thanks

1
Tue Aug 2, 2016, 2:23 pm

ESC plan

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Imran Hasan  on 

Hi, Can anyone provide me Construction Activity Pollution Prevention based ESC Plan template. Thanks, Imran

1
Mon Aug 1, 2016, 2:47 pm

One building.

NC-2009 MPR5:Must comply with minimum occupancy rates
posted by  CT G  on 

We are currently working on a single office project for a corporate client.

1
Tue Jan 17, 2017, 9:48 pm

Master Site Credit

Pilot-Credits IPpc88:LEED O+M Starter Kit
posted by  Megan Recher  on 

We registered this with our Master Site for a high school campus plan in Texas. The site includes multiple existing buildings as well as two new construction buildings.

0

Non-LEED-Certifiable Buildings on Site

CS-2009 MPR3:Must use a reasonable site boundary
posted by  Krissy Buck Flickinger  on 

Hello everyone- I have basically two questions in one, regarding how to treat additional buildings on your site. Project Background: I have an 880,000 SF site.

0

Green-E Equivalency

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  David Ellner  on 

We have pursued EAc4, using a combination of on site and off site renewable energy sources. On site sources is not a problem.

1
Wed Mar 8, 2017, 11:49 pm

Energy Modeling for Design Sumittal

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear All:- we plan to submit a project in Design stage so please advise how to do energy model in design model what are the major changes in energy model between Design and Construction submission

1
Tue Aug 2, 2016, 3:14 pm