Forum quick links
Can I omit the IP credit since it is stand alone?
NC-v4 IPc1:Integrative processposted by wachira sosaeng on
Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.
Narrative explaining compliance of ESC plan with NPDES guideline
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Madhura Dhayagude on
Hi, We are currently in Construction review for a MFHR project based in Philadelphia, PA.
Energy Star compliant attic access doors
posted by Phil Vanderloo on
Can anyone steer me to a good source for a residential attic access door with compliant gaskets and insulation required by Energy Star V3? Thanks
ESC plan
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Imran Hasan on
Hi, Can anyone provide me Construction Activity Pollution Prevention based ESC Plan template. Thanks, Imran
Facilities and alterations. Outside the building
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Mercè Llorca on
There are outside works planned to be done.
One building.
NC-2009 MPR5:Must comply with minimum occupancy ratesposted by CT G on
We are currently working on a single office project for a corporate client.
Master Site Credit
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Megan Recher on
We registered this with our Master Site for a high school campus plan in Texas. The site includes multiple existing buildings as well as two new construction buildings.
Non-LEED-Certifiable Buildings on Site
CS-2009 MPR3:Must use a reasonable site boundaryposted by Krissy Buck Flickinger on
Hello everyone- I have basically two questions in one, regarding how to treat additional buildings on your site. Project Background: I have an 880,000 SF site.
Green-E Equivalency
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by David Ellner on
We have pursued EAc4, using a combination of on site and off site renewable energy sources. On site sources is not a problem.
Energy Modeling for Design Sumittal
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- we plan to submit a project in Design stage so please advise how to do energy model in design model what are the major changes in energy model between Design and Construction submission