Forum quick links
Building Area Method - highlighting merchandise
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
For a building I have to use the Building Area Method (ASHRAE 90.1-2007, 9.5.1) because some calculations were already developed through that method and now changing the method would be complicated
IEQp1&c2 Documentation
CI-2009 IEQp1:Minimum IAQ Performanceposted by Jordan Kirrane on
Hello, For my project building the mechanical engineer has provided me with his VAV sizing calculation spreadsheets for all zones and all floors.
Thermal Barrier Tape and EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Jennifer Webb on
I talked to a leading manufacturer of thermal barrier tape which typically requires an EPD to be included in the credit.
Using pre-existing conditions as oppposed to existing conditions
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Mei Zhu on
SS C6.1 has two cases: Case 1: Sites with existing imperviousness 50% or less: Requires proposed runoff not exceeding the existing runoff. Case 2: Sites with existing imperviousness greater than 50
Weekly Log
EBOM-v4 WEc4:Water meteringposted by Kristina Pobre on
Is there a minimum number of logs required to be submitted to comply with this credit? The project I am handling wishes to install the meter but because of the log requirement, we might need to de
Epoxy mortar for anchoring rebar in concrete
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Anna Okviana on
Hai, my project use epoxy glue for anchoring rebar from brick wall to column and slab in indoor area. Does it must meet LEED requirement for adhesive and sealant?
Sliding Scale
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Kristina Bach on
I wish that this Pilot Credit had some sort of sliding scale built-in for the size of the donation.
Pilot Credit / ID Credit for NC
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Nicholas Bristow on
I am trying to use this on a new construction, residential project. Has anyone been successful in using this credit as a pilot credit or innovation credit for NC?
Hard-lid Ceiling
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Khaled Hamaideh on
Hi In our Project we can't apply deck-to-deck partitions in some janitor rooms so we are looking for (hard-lid ceiling) option.
Design submittal - Tender LOD Documentatio valid for EAp2?
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Velez on
Dear all, I'm am modelling a project that is aiming to get EAp2 at design submittal with Tender Documentation LOD (Level of Detail), meaning there are lots of parameter only defined by technical sp